1.7.08

Thesis Reference & Bibiliography - IBS

Abderrahim, M., Diez, R., Boudjabeur. S., Navarro-Suñer, J. M. and Balaguer, M (2005) An IT Infrastructure and safe collaboration in modern construction site, 22nd International Symposium on Automation and Robotics in Construction ISARC 2005 - September 11-14, 2005, Ferrara (Italy)

Alshawi, M. Goulding, J. Nadim, W. (2007) Training and Education for Open Building Manufacturing: Closing the Skill Gap Paradigm, (edited by) Kazi, A. S., Hannus, M., Boudjabeur, S., Malone, A. (2007), Open Building Manufacturing – Core Concept and Industrial Requirement’, Manubuild Consortium and VTT Finland Publication, Finland

Agapiou A.,Clausen L.E., Flanagan R.,Norman G., Notman D.(1998) The role of logistics in the materials flow control process, Construction Management and Economics, Volume 16, Number 2, pp. 131-137(7)

Ball, M. (1996) Housing and Construction: A Trouble Relationship?, The Policy Press, Bristol

Barlow, J., (2000)Innovation and learning in complex offshore construction projects, Research Policy, 29(7-8), 973-89.

Barlow, J., Ozaki, R. (2003) Achieving ‘Customer Focus’ in Private Housebuilding: Current Practice and Lessons from Other Industries, Housing Studies, Vol. 18, No. 1, 87–101, 2003

Blismas, N. G., Pasquire, C. & Gibb, A. F. G. (2003) IMMPREST, Loughbrough University, Loughbrough

Blismas, N., G., Pasquire, C. & Gibb, A. F. G. (2006) Benifit Evaluation of Offsite Production in Construction, Construction Management & Economics, 24, 121-30

Blismas, N. (2007) Offsite Manufactured in Australia: current state and future direction, Corporative Research Centre for Construction Innovation, Brisbane

Blayse A. M & Manley, K. (2004) Key Influence of Construction Innovation, Construction Innovation, Vol 4, No 3, pp 1-12

Bock, T., Unser, R., Clausen, T. & Miewald, T. (2007) Crossover Design, the proceedings of 1st Manubuild Conference, April 2007, Rotherdam

Bresnen, M., Marshall, N. (2000) Partnering in Construction: A Critical Review of Issues, Problems and Dilemmas, Construction Management and Economics, 18, 229-237.

Bullen, C.V. & Rockhart, J.F., (1981) A primer on critical success factors (Working Paper No. 69), Massachusetts Institute of Technology, Sloan School of Management, Centre for Information Systems Research, Cambridge, Massachusetts

Camp, R (1989) Benchmarking: the Search for Best practice that Lead to Superior Performance, Quality Press, New York

Chung, L. P. & Kadir, A. M. (2007) Implementation Strategy for Industrialized Building System. PhD thesis, Universiti Teknologi Malaysia (UTM), Johor Bahru

CIB (Construction Industry Board) (1997) Partnering in the Team, in A Report by Working Group 12 of the Construction Industry Board, London, Thomas Telford.

Clarke, L. (2002) Standardisation and Skills; A transnational study of skill, education and training for pre-fabrication in housing, University of Westminister Business School, London

Clarke, L. & Herrmann, G. (2004) Cost vs Production: disparities in social housing construction in Britain and Germany, Construction Management & Economics, 22(5), 521-32

Construction Industry Master Plan (CIMP 2006 – 2015) (2007), Construction Industry Development Board Publication, Malaysia, Kuala Lumpur

Cuperus, Y (1998) Lean Building and the Capacity to Change, Open House International, 23, No 2, pp 5-13

Din, H. (1984) Industrialised Building and its Application in Malaysia, Proceeding of Prefabrication Building Construction Seminar, Kuala Lumpur

D. Drew and M. Skitmore, The effect of contract type and size on competitiveness in bidding, Construction Management and Economics 15 (1997), pp. 469–489

Esa, H. and Nurudin, M. M. (1998) Policy on Industrialised Building Systems, Colloquium on Industrialised Construction Systems, Kuala Lumpur

Egan, J. (1998), Rethinking Construction, Department of Environment, Transport and the Regions (DETR), London, Report of the Construction Task Force on the Scope for Improving the Quality and Efficiency of the UK Construction Industry

Eichert, J., Kazi, A. S. (2007) Vision and Strategy of Manubuild- Open Building Manufacturing (edited by) Kazi, A. S., Hannus, M., Boudjabeur, S., Malone, A. (2007), Open Building Manufacturing – Core Concept and Industrial Requirement’, Manubuild Consortium and VTT Finland Publication, Finland

Faizul, N.A, Mustafa, W.AW (2006) Why Knowledge Management is Crucial to the Realization of IBS Roadmap 2003-2010 Implementation, IBS Digest, Issue 2, pg 4, 2006, Kuala Lumpur

Faizul (2006), Supply Chain Management in IBS Industry, proccedings in Malaysian International IBS Exhabition, Kuala Lumpr

Gibb, A (2001), Standardization and pre-assembly – distinguishing myth from reality using case study research, Construction Management and Economics 19(3), 307–315

Gibb, A. (2001) Pre-assembly in construction: A review of recent and current industry and research initiatives on pre-assembly in construction, CRISP Consultancy Commission – 00/19, May 2001

Gibb, A., Isack, F. (2003) Re-engineering trough pre-assembly: client expectation and drivers, Building Research Information 31(2) 146-160

Gue, S. S. (2007) Bridging the Gap between R&D and Construction Industry, Keynote address at Construction Industry Research Achievement International Conference, Putra World Trade Centre (PWTC). Kuala Lumpur.

Goodier, C. & Gibb, A. (2004) Barriers and Opportuities for Offsite Production, PROSPA, Luoghbrough University, Loughbrough

Goodier C. & Gibb, A. (2006) Future opportunities for off-site in the UK, Construction Management and Economic, 25, 6, 585-595

Goodier, C. & Gibb, A. (2005) The value of UK Market for Off-site, Buildoffsite, London

Gould, F. E. (2005) Managing the construction Process (3rd Edition), Prantice Hall, New Jersey

Gray, C. & Flanagan, R (1989), The Changing Role of Specialist and Trade Contractors, The Chartered Institute of Buildings, London

Hervas, F. C., Ruiz, M. I. V. (2007) Stakeholders Requirement for Open Building manufacturing (edited by) Kazi, A. S., Hannus, M., Boudjabeur, S., Malone, A. (2007), Open Building Manufacturing – Core Concept and Industrial Requirement’, Manubuild Consortium and VTT Finland Publication, Finland

Hussein, J. (2007) Industrialised Building Systems: The Challenge and The Way Forward. Keynote Address at Construction Industry Research Achievement International Conference, Putra World Trade Centre (PWTC). Kuala Lumpur.

Hofman, E., Halman,J., Voordijk, H. (2007) Aligning product architecture design and sourcing decisions in the house-building industry, the proceedings of 1st Manubuild Conference, Rotterdam

Hong-Minh, S.M., barker, R. and Naim, M.M. (2001), Identifying Supply Chain Solution in the UK Housing Building Sector, European Journal of Purchasing & Supply Management, 7, 49-59

Housing Forum (2001) Enimies of promise, Housing Forum, London

Hamid, Z., Kamar, K. A. M., Zain, M., Ghani, K., Rahim, A. H. A. (2008) Industrialized Building System (IBS) in Malaysia: the current state and R&D initiatives, Malaysia Construction Research Journal, Vol. 2 (1), pp 1-13

IBS Roadmap (2003-2010) (2003) Construction Industry Development Board (CIDB), Kuala Lumpur

IBS Roadmap Review (Final Report) (2007), 2007, IBS Centre, Construction Industry Development Board, Malaysia, Kuala Lumpur (unpublished)

IBS Steering Committee (2006) Minute Meeting of IBS Steering Committee, Construction Industry Development Board (CIDB) Malaysia, Kuala Lumpur (unpublished)

IBS Survey 2003 (2003), Construction Industry Development Board Malaysia (CIDB), Kuala Lumpur

Ingram, H., Biermann, K., Cannon, J., Neil, J. and Waddle, C. (2000) Internalizing action learning: a company perspective, Establishing critical success factors for action learning courses, International Journal of Contemporary Hospitality Management 12 (2) (2000), pp. 107–113

Jaselskis, E., J., Anderson, M., R., Charles T. Jahren, Y., Rodriguez, S. (1995) Radio-Frequency Identification Applications in Construction IndustryJournal of Construction Engineering and Management, Vol. 121, No. 2, pp. 189-196.

Jaeger, J (2007) InPro- Integrated project within the 6th Framework Program, the procedings of 1st Manubuild Conference, April 2007, Roterdam

Johansson, M., Lassl, V., Löfgren, P., Engström, B. & Kliger, R (2007) Standardised information flow for connections in industrialised construction, 1st Manubuild Consortium, April 2007, Roterdam

Junid, S.M.S. (1986), Industrialised Building System, Proceedings of UNESCO/ FEISEAP Regional Workshop, Universiti Putra Malysia (UPM), Serdang, Selangor.

Kumaraswamy, M., Dulaimi, M., (2001) Empowering innovative improvements through creative construction procurement, Engineering Construction and Architectural Management, 8(5-6), 325-35.

Krogt, F and Warmerdam, J (1997), Training in Different Types of Organizations: Differences and Dynamics in the Organization of Learning at Work, International Journal of Human Resource Management, Vol. 8, Part 1, pp 87- 105

Leonard, D. (2001), CONCUR: Joining up Construction, paper ECCE 2001-24, Construction Informatics Digital Library, e-construct publication

Lessing, J., Ekholm, A. and Stehn, L. (2005) Industrialized Housing – Definition and Categorization of the Concept. 13th International Group for Lean Construction, Australia, Sydney

Lingham, T. et al. (2006). An evaluation system for training programs: a case study using a four-phase approach, Career Development International, 11 (4), pp. 334-351

Love, P.E.D., Irani, Z., Cheng, E., Li, H., (2002) A model for supporting inter-organisational relations in the supply chain, Engineering Construction and Architectural Management, 9(1), 2-16.

Lusby- Taylor, P., Morrison, S., Ainger, C. & Ogden, R. (2004) Design and Modern Method of Construction, Commission of Architecture and Built Environment (CABE), London

Malaysian Construction Outlook 2007 (2007) Construction Industry Development Board Malaysia (CIDB), Kuala Lumpur

Manubuild (2008), Open Building manufacturing, Manubuild Newsletter, 7, March 2008, Manubuild Consortium

Martinez, S., Barcena, C, Balaguer, J., Navarro, J. M., Bosch, C., Rubia, A., (2007) User Oriented Interactive Building Design (edited by) Kazi, A. S., Hannus, M., Boudjabeur, S., Malone, A. (2007), Open Building Manufacturing – Core Concept and Industrial Requirement’, Manubuild Consortium and VTT Finland Publication, Finland

Ministry of Finance Malaysia (2005) Economic Report Malaysia 2004-2005, Malaysia, Kuala Lumpur (Unpublished)

Miozzo, M., Dewick, P., 2002, Building competitive advantage: innovation and corporate governance in European construction, Research Policy, 31(6), 989-1008.

Nam C. H. & Tatum C. B. (1997) Leaders and champions for construction innovation, Construction Management and Economics, Volume 15, Number 3, pp. 259-270(12)

Naim, M. & Barlow, J. (2003), An innovative supply chain strategy for customised housing, Construction Management & Economics. 21 (6), 593-602

NST (2008) Plan to replace foreign workers with locals (newspaper cutting achieved on 15/9/2008) New Streets Times Malaysia Press, Kuala Lumpur

NPC (2007) Guidebook on Benchmarking for Best Practice, National Productivity Corporation of Malaysia, Kuala Lumpur

Oostra, M., Joonson, C., C. (2007) Best practices: Lesson Learned on Building Concept (edited by) Kazi, A. S., Hannus, M., Boudjabeur, S., Malone, A. (2007), Open Building Manufacturing – Core Concept and Industrial Requirement’, Manubuild Consortium and VTT Finland Publication, Finland

Palmer, S., Jones, K., Coffey, M. & Blundell, C. (2003) Innovation in Construction: Maintenence and the Egan Agenda, The Palmer Partnership, Dartford.

Pan W., Gibb, A., Dainty, A. R. J. (2007) Perspectives of UK housebuilders on the use of off-site modern method of construction, Construction Management and Economic, 25, 2, 183-194

Pan W., Gibb, A., Dainty, A. R. J. (2008) Leading UK housebuilders utilization of off-site construction method, Building Research & Information, 36, 1, 56-67

Parid, W. (1997), Global Trends in Research, Development and Construction, Proceeding of the International Conference on Industrialised Building System (IBS 2003), CIDB Malaysia.

Payne, G. K. (1977), Low Income Housing in the Developing World, John Wiiley & Sons, New York

Peng, C.S., (1986), The scenario of Industrialised Building System in Malaysia. Proceeding INESCO/FEISEAP Regional Workshop. UPM, Malaysia

Putnam, A.O. (1985) `A redesign for engineering,’ Harvard Business Review, May-June, 31(3), 139-44.

Quinn, J.B. (1985) `Managing innovation: controlled chaos,’ Harvard Business Review, May- June, 31(3), 78- 84.

Ranns, R. H. B, Ranns, E. J. M (2005) Practical Construction Management, Taylor & Francis, New York

Razak, M. E (2008), Causes Delays in Building Construction Project in Egypt, Journoul of Construction Engineering and Management, Vol: 134, Issues:11, p831-841

Rahman, A. B. A, Omar, W. (2006) Issues and Challenge in the Implementation of IBS in Malaysia, Proceeding of the 6th Asia Pacific Structural Engineering and Construction Conference (ASPEC 2006), 5-6 September 2006. Kuala Lumpur, Malaysia

Rockhart, J.F. & Crescenzi, A.D., (1984) Engaging top management in information technology, Sloan Management Review 25 (4), pp. 3–16

Sanderson, G. (2003) Strategic review of the use of modern methods of construction in new build and refurbishment housing projects, unpublished Richard Hodkinson Consultancy report

Sears, S. K., Sears, G. A., Clough, R. H. (2008) Construction Project Management, 5th Edition, John Wiley & Sons, New Jersey

Sharp, M., Jones, K., Coffey, M. (2007) Attitudes towards pre-fabricated housing: The training conundrum, the proceedings of 1st Manubuild Conference, April 2007, Rotherdam

Sleezer, C (1993), Training Needs Assessment at Work: A Dynamic Process, Human Resource Development Quarterly, Vol. 4, Part 3, pp 247-264

Sun, M & Howard, R (2004) Understanding IT in Construction, Spoon Press, London

Stone, P. A. (1970) Urban Development in Britain – Standard, Cost and Resources. Cambridge University Press, Cambridge

Strassmann, W.P (1975), Industrialised System Building for Developing Countries – a discouraging progress. International Technical Co-operation Centre Review, 4, pp 99-113

Swee, H. P. (1998) Malaysia, A review of industrialized building systems. Pp. 133 - 141. 28. Edited by Sarja in Open and Industrialised Building, E & FN Spoon, London

Thanoon, W. A. M., Peng, L. W., Abdul Kadir, M. R., Jaafar, M.S. and Salit, M.S. (2003), The Experiences of Malaysia and Other Countries in Industrialised Building System in Malaysia, Proceeding on IBS Seminar, UPM, Malaysia

Trikha, D. N. (1999) Industrialised Building System: Prospect in Malaysia, Proceeding of
World Engineering Congress, Kuala Lumpur.

Van de Ven, A. H. (1986) Central Problem in the Management of Innovation, Management Science, 32 (5), 590-607

Venables, T., Barlow, J. & Gann, D. (2004) Manufacturing Excellence: UK Capacity in Off-site Manufacturing, Housing Forum, London

Verweij, S., Voorbij, L. (2007) Scenarios for Future Development of Flexible Housing, Proceedings of Manubuild Conference, 25 – 26 April 2007, Rotterdam

Warszawski, A. (1999) Industrialized and Automated Building System, Technion-Israel Institute of Technology, E & FN Spoon

Winch, G.M., 2000, Innovativeness in British and French construction: the evidence from Transmanche-Link. Construction Management and Economics 18(7), 807-18.

Woo, G., D. & Ellis, R. C. T (2005) Main contractor experience pf partnering relationship on UK construction projects, Construction Management & Economic, 23 (3), 317-325

No comments: